Planning

·

4

min read

Do I need a permit for a deck?

Most decks need one. What triggers a permit, what the inspector checks, and how long it takes.

Article cover

In most towns, yes. A deck that is attached to the house, more than 30 inches off the ground or larger than about 200 sq ft almost always needs a building permit.

What the inspector checks

Footing depth, the ledger connection to the house, joist spans, stair dimensions and guard height. Most failures we see on old decks are at the ledger.

How long it takes

Two to four weeks is normal around here. We draw the plans and file the permit as part of every build, so it runs while your materials are ordered.

Want your own number?

Draw your deck in the planner and see a price range in about a minute.

Open the Deck Planner

Deckwright

Decks, pergolas and patios built for long summer evenings. Licensed, insured and backed by a 10 year workmanship warranty.

Plan your deck

Visit

214 Cedar Ridge Road

Lakemont, CO 80321

(555) 014-2290

hello@deckwright.co

© 2026 Deckwright Outdoor Co. All rights reserved.

Licensed and insured. Lic. DW-20419 · Privacy

Deckwright

Decks, pergolas and patios built for long summer evenings. Licensed, insured and backed by a 10 year workmanship warranty.

Plan your deck

Visit

214 Cedar Ridge Road

Lakemont, CO 80321

(555) 014-2290

hello@deckwright.co

© 2026 Deckwright Outdoor Co. All rights reserved.

Licensed and insured. Lic. DW-20419 · Privacy

Deckwright

Decks, pergolas and patios built for long summer evenings. Licensed, insured and backed by a 10 year workmanship warranty.

Plan your deck

Visit

214 Cedar Ridge Road

Lakemont, CO 80321

(555) 014-2290

hello@deckwright.co

© 2026 Deckwright Outdoor Co. All rights reserved.

Licensed and insured. Lic. DW-20419 · Privacy

Create a free website with Framer, the website builder loved by startups, designers and agencies.